{"product_id":"waterproof-dog-training-leash-long-lead-all-sizes","title":"Waterproof Dog Training Leash 10\/20\/30\/50ft – DuraSoft Poly Coated Nylon Long Lead for Large Medium Small Dogs – Tangle-Resistant Recall Leash for Hiking Camping Beach Yard Swimming","description":"\u003ch2\u003eWaterproof Dog Training Leash – Long-Lasting Control for Every Outdoor Adventure\u003c\/h2\u003e\u003cp\u003eTrain smarter and explore further with our \u003cstrong\u003eWaterproof Dog Training Leash\u003c\/strong\u003e. Made from DuraSoft flex poly coated nylon, this long lead is built to handle the toughest outdoor conditions — water, sand, mud, and more — without getting soggy, sticky, or smelly. Available in 10ft, 20ft, 30ft, and 50ft lengths, it’s the go-to recall and freedom leash for dogs of all sizes who love the outdoors.\u003c\/p\u003e\u003ch2\u003eWhy Dog Owners \u0026amp; Trainers Love This Leash\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003e💧 \u003cstrong\u003eWaterproof \u0026amp; Easy to Clean\u003c\/strong\u003e – Poly coated nylon repels water and sand, dries instantly, and wipes clean without absorbing odors\u003c\/li\u003e\n\u003cli\u003e💪 \u003cstrong\u003eIncredible Tensile Strength\u003c\/strong\u003e – Built to withstand 600–750 lbs of pull force — safe and secure even for the strongest dogs\u003c\/li\u003e\n\u003cli\u003e🔄 \u003cstrong\u003eTangle-Resistant Design\u003c\/strong\u003e – The material is highly resistant to knotting, even when other dogs are nearby or the leash is dragged through water\u003c\/li\u003e\n\u003cli\u003e📏 \u003cstrong\u003e4 Length Options\u003c\/strong\u003e – Choose 10ft, 20ft, 30ft, or 50ft to match your training goals and outdoor environment\u003c\/li\u003e\n\u003cli\u003e🏕️ \u003cstrong\u003eAll-Terrain Versatile\u003c\/strong\u003e – Perfect for hiking, camping, beach play, yard use, swimming, hunting, and recall training\u003c\/li\u003e\n\u003cli\u003e🎁 \u003cstrong\u003eGreat Gift for Dog Owners\u003c\/strong\u003e – A premium, practical gift for any active dog owner or trainer\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch2\u003eProduct Specifications\u003c\/h2\u003e\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003eFeature\u003c\/th\u003e\n\u003cth\u003eDetails\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMaterial\u003c\/td\u003e\n\u003ctd\u003eDuraSoft Flex Poly Coated Nylon\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWidth\u003c\/td\u003e\n\u003ctd\u003e1\/2 inch\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eAvailable Lengths\u003c\/td\u003e\n\u003ctd\u003e10ft \/ 20ft \/ 30ft \/ 50ft\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eTensile Strength\u003c\/td\u003e\n\u003ctd\u003e600–750 lbs Pull Force\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWater Resistance\u003c\/td\u003e\n\u003ctd\u003eWaterproof \/ Quick-Dry\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eTangle Resistance\u003c\/td\u003e\n\u003ctd\u003eHigh – Knot-Resistant Material\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCompatible Dog Sizes\u003c\/td\u003e\n\u003ctd\u003eSmall, Medium, Large\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBest For\u003c\/td\u003e\n\u003ctd\u003eRecall Training, Hiking, Beach, Camping, Yard, Swimming\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eQ: What length should I choose for recall training?\u003c\/strong\u003e\u003cbr\u003eA: The 30ft leash is the most popular for recall training in open spaces. The 50ft option provides maximum freedom for beach, open fields, and advanced training. Start with 10ft or 20ft for smaller yards or beginning training.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eQ: Is this leash really waterproof?\u003c\/strong\u003e\u003cbr\u003eA: Yes — the poly coated nylon is waterproof and won’t absorb water the way fabric or standard nylon leashes do. It dries fast and sand doesn’t stick to it, making it ideal for beach and water use.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eQ: Can this leash handle a large, strong dog?\u003c\/strong\u003e\u003cbr\u003eA: Absolutely. The leash is rated for 600–750 lbs of pull force, making it suitable for even the largest and strongest breeds.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eQ: Will the leash tangle or knot during use?\u003c\/strong\u003e\u003cbr\u003eA: The DuraSoft poly coated material is specifically designed to resist knotting and tangling — even when dragged through water or around other dogs’ feet.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eQ: Is this a good gift for a dog owner?\u003c\/strong\u003e\u003cbr\u003eA: Absolutely — especially for active owners who hike, camp, or spend time at the beach with their dogs. A premium waterproof long line is a gift they’ll use constantly.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eQ: How do I clean this leash?\u003c\/strong\u003e\u003cbr\u003eA: Simply rinse with water and wipe down with a cloth. The coating prevents dirt and sand from sticking, so cleanup is quick and easy.\u003c\/p\u003e\u003ch2\u003eFast US Shipping\u003c\/h2\u003e\u003cp\u003eShips from US warehouse, free delivery 2-7 business days.\u003c\/p\u003e","brand":"Main Street Mercantile","offers":[{"title":"Orange \/ M","offer_id":67620340433140,"sku":null,"price":31.84,"currency_code":"USD","in_stock":true},{"title":"Black \/ M","offer_id":67620340465908,"sku":null,"price":31.84,"currency_code":"USD","in_stock":true},{"title":"Peacock Blue \/ M","offer_id":67620340498676,"sku":null,"price":32.59,"currency_code":"USD","in_stock":true},{"title":"Space Gray \/ M","offer_id":67620340531444,"sku":null,"price":31.84,"currency_code":"USD","in_stock":true},{"title":"Burgundy \/ M","offer_id":67620340564212,"sku":null,"price":33.6,"currency_code":"USD","in_stock":true},{"title":"Orange \/ L","offer_id":67620340596980,"sku":null,"price":45.17,"currency_code":"USD","in_stock":true},{"title":"Black \/ L","offer_id":67620340629748,"sku":null,"price":45.17,"currency_code":"USD","in_stock":true},{"title":"Peacock Blue \/ L","offer_id":67620340662516,"sku":null,"price":34.31,"currency_code":"USD","in_stock":true},{"title":"Space Gray \/ L","offer_id":67620340695284,"sku":null,"price":45.17,"currency_code":"USD","in_stock":true},{"title":"Burgundy \/ L","offer_id":67620340728052,"sku":null,"price":45.17,"currency_code":"USD","in_stock":true},{"title":"Orange \/ XL","offer_id":67620340760820,"sku":null,"price":45.43,"currency_code":"USD","in_stock":true},{"title":"Black \/ XL","offer_id":67620340793588,"sku":null,"price":45.43,"currency_code":"USD","in_stock":true},{"title":"Peacock Blue \/ XL","offer_id":67620340826356,"sku":null,"price":45.3,"currency_code":"USD","in_stock":true},{"title":"Space Gray \/ XL","offer_id":67620340859124,"sku":null,"price":45.43,"currency_code":"USD","in_stock":true},{"title":"Burgundy \/ XL","offer_id":67620340891892,"sku":null,"price":45.43,"currency_code":"USD","in_stock":true},{"title":"Orange \/ XXL","offer_id":67620340924660,"sku":null,"price":66.5,"currency_code":"USD","in_stock":true},{"title":"Black \/ XXL","offer_id":67620340957428,"sku":null,"price":51.91,"currency_code":"USD","in_stock":true},{"title":"Peacock Blue \/ XXL","offer_id":67620340990196,"sku":null,"price":50.52,"currency_code":"USD","in_stock":true},{"title":"Space Gray \/ XXL","offer_id":67620341022964,"sku":null,"price":52.0,"currency_code":"USD","in_stock":true},{"title":"Burgundy \/ XXL","offer_id":67620341055732,"sku":null,"price":51.91,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0854\/4449\/3556\/files\/3e34627a-4581-4997-b3f3-61a03d192ea5.jpg?v=1790657789","url":"https:\/\/mainstreet-99.myshopify.com\/products\/waterproof-dog-training-leash-long-lead-all-sizes","provider":"Main Street","version":"1.0","type":"link"}